Normal view MARC view ISBD view

6-m3 biodigeter construction process and its effectiveness (ដំណើរការសាងសង់និងប្រសិទ្ធភាពឡជីវឧស្ម័នទំហំ៦ម៣)

by ROS, PHOURA.
Material type: materialTypeLabelBookPublisher: Phnom Penh RUA 2010Description: xii, 58p. ill. 29cm.DDC classification: ATM ROS 2010 B197 Or.1 Online resources: Click here to access online
Tags from this library: No tags from this library for this title. Add tag(s)
Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due
ATM ATM Library Block B
B197
ATM ROS 2010 B197 Or.1 (Browse shelf) Checked out to sophors chor (RUA140931) 06/03/2018
ATM ATM Library Block B
B197
ATM ROS 2010 B197 Or.2 (Browse shelf) In transit from Library Block C to Library Block B since 21/10/2016
ATM ATM Library Block B
B197
ATM ROS 2010 B197 Or.3 (Browse shelf) Available
ATM ATM Library Block B
B197
ATM ROS 2010 B197 Or.4 (Browse shelf) Available
ATM ATM Library Block B
B197
ATM ROS 2010 B197 Or.5 (Browse shelf) Available
ATM ATM Library Block B
B197
ATM ROS 2010 B197 Or.6 (Browse shelf) Available
ATM ATM Library Block B
B197
ATM ROS 2010 B197 Or.7 (Browse shelf) Checked out to sereypanha sith (rua120521) 28/05/2016
ATM ATM Library Block B
B197
ATM ROS 2010 B197 Or.8 (Browse shelf) Available

There are no comments for this item.

Log in to your account to post a comment.
មជ្ឈមណ្ឌលឯការនៃសាកលវិទ្យាល័យភូមិន្ទកសិកម្មចំការដូង

Powered by Koha